infrastructure
3 ½ acre fabrication facility

Equipped with Beam – Line

Delivery Fleet of Boom Trucks

Papp Iron Works Facility
Our fabrication capacity includes an automated drill line capable of processing steel profiles up to 40” jumbo beams, an automated angle master capable of processing angles, flats and channels, a plasma cutting table with a capacity of 2” plate and all processes of welding including SWAC and SMAC. Together, these machines allow us to competitively fabricate steel with exceptional accuracy and speed.
We are equipped with:
|
|
